Pick the VCET stop/target/trail cell from the 0E EMA × exit surface — Still the #1 open step. Today added the v0.1.2 expansion-gate timing study on top of the 0A bleed-cut and the wide 0E surface; everything needed to choose the cell is now on disk. Picking it turns the bleed-cut into a sized, forward-testable rule.
Build the VCET Phase 0B scanner-filter off the entry contract — Contract + CBO context + v0.1.2 timing are all validated. The live scanner gate that applies the contract is still unbuilt; pairs with the 0E cell pick for a complete entry+exit rule.
Schedule the 3 strategy-view refreshers + wire monitor-reclass — The canonical master is now live, but strategy_bar/strategy_registry went watchdog-RED at 21:31 again — the derived views have no scheduled refresh, so the monitor false-alarms after every master change. Last loose end on the consolidation.