Daily — 2026-06-16

Tuesday · Generated by nightly-project-manager · ← All Todos · ← Jun 15
0
Shipped
0
Moved Forward
0
Blocked

TODAY — Top 3

  1. Pick the VCET stop/target/trail cell from the 0E EMA×exit surface — Still the #1 open step. Today validated CBO context, not the cell pick. The 0E surface (EMA4/9/20 × full/80-20 exit) is wide enough now; choosing the cell is what turns the 0A bleed-cut into a sized, forward-testable rule.
  2. Build the VCET Phase 0B scanner-filter off the (now CBO-validated) entry contract — CBO-context layer was validated today, so the contract's context inputs are confirmed. The live scanner gate that applies the contract is still unbuilt — pairs with the 0E cell pick for a complete entry+exit rule.
  3. Schedule the 3 strategy-view generators + wire monitor-reclass — The 3 views now generate from the canonical master, but the watchdog went RED mid-rebuild today. They need a scheduled refresh so they stay fresh and the monitor stops false-alarming.

What shipped

What moved forward

What's blocked

Files touched