Daily Writeup — 2026-06-09

Tuesday · Generated by nightly-project-manager · ← All Todos · ← Jun 08
0
Shipped
0
Moved Forward
0
Blocked

TODAY — Top 3

  1. Start the VWAP Pull-In live forward-test — log GREEN setups against the new tracker. The walk-forward OOS validation finished today with a clear verdict: HOLD historical promotion, forward-test next. The tracker + schema + actionable playbook were built today, so the rig is ready. Wed is a trading day — trade only the OOS-durable core (cut the post-entry fade, pass gap >1.5% RED, avoid non-megacap) and log each GREEN setup live. It's the only way to settle a verdict the historical test half (worse regime + one IBIT −$216 outlier) was too small to settle.
  2. Send CloudQuant the Liberator minute_bars entitlement-restoration request (still unsent). Market-independent, still the #1 data unblock. Entitlements collapsed 27→10 datasets — minute_bars/all market_data gone. Today's validation only worked because it reused the existing backfill; new mechanism work past June is still blocked. The cached NVDA-6/2 pair proved exact parity, so only access is missing. Send it first thing to start the clock.
  3. Calibrate the Backside-Long reclaim ceiling. The AAOI-triggered backside rebuild + 90-day backtest finished today (read-only, dev). The old gate mislabeled reclaim entries because it tested entry depth, not the VWAP reclaim. The rebuilt backside_lifecycle.py is ready but blocked on one James decision — the reclaim ceiling — before the P1–P6 promotion path can start.

What shipped

One of the biggest build days on record — six active threads. Threads A–C published to the live site; D–F are dev/read-only research rigs.

Thread A — VWAP Pull-In Quality Gate validation (the today-focus #3 ask):

This directly answers the profitability-diagnosis "walk-forward overfit?" question: the entry gate alone does not survive a regime shift — the post-entry overlay does.

Thread C — scorecard chart-viewer: new _shared/chart_viewer.js → chart_viewer_v2.js (iteration) + _shared/tooltip.js, with CHART_VIEWER_BRIEFING.md as the spec.

Thread D — Projected 5DMA Environment (dev/read-only): built the 6/9 memo into a working rig — a ~200-symbol daily-bar pull, feature build + analyze + multitrader, and an archetype interpreter (strategy_archetype_map.v1.json + archetype_env_rule_matrix.csv) that operationalizes the archetype-conditional finding (continuation wants up-env; Backside-Long wants the opposite washout). Shipped the research report, strategy-aware addendum, implementation plan, forward-test plan, a live forward-test rig + dashboard, and an index page. Rec stands: context tag + risk tier, not a trigger.

Thread E — Setup-Grade Risk Hotkey (forward-test only): advanced from "awaiting" toward a runnable rig. The GamePlan emit contract now exists (gameplan_export.py + setups.today.sample.json + contract/setups.schema.json), plus target_engine.py (grade→target sizing/auto-stop), Kore Backend A (kore_backend.py + tests + skeleton), engine.py/hotkey.py, register_speed_key.ps1, and SPEC.md + FORWARD-TEST-CHECKLIST.md. Execution still inert pending firm-confirm of the Gr8Script/Kore calls.

What moved forward

What's blocked

Files touched