backside_lifecycle.py is ready but blocked on one James decision — the reclaim ceiling — before the P1–P6 promotion path can start.One of the biggest build days on record — six active threads. Threads A–C published to the live site; D–F are dev/read-only research rigs.
Thread A — VWAP Pull-In Quality Gate validation (the today-focus #3 ask):
This directly answers the profitability-diagnosis "walk-forward overfit?" question: the entry gate alone does not survive a regime shift — the post-entry overlay does.
Thread C — scorecard chart-viewer: new _shared/chart_viewer.js → chart_viewer_v2.js (iteration) + _shared/tooltip.js, with CHART_VIEWER_BRIEFING.md as the spec.
Thread D — Projected 5DMA Environment (dev/read-only): built the 6/9 memo into a working rig — a ~200-symbol daily-bar pull, feature build + analyze + multitrader, and an archetype interpreter (strategy_archetype_map.v1.json + archetype_env_rule_matrix.csv) that operationalizes the archetype-conditional finding (continuation wants up-env; Backside-Long wants the opposite washout). Shipped the research report, strategy-aware addendum, implementation plan, forward-test plan, a live forward-test rig + dashboard, and an index page. Rec stands: context tag + risk tier, not a trigger.
Thread E — Setup-Grade Risk Hotkey (forward-test only): advanced from "awaiting" toward a runnable rig. The GamePlan emit contract now exists (gameplan_export.py + setups.today.sample.json + contract/setups.schema.json), plus target_engine.py (grade→target sizing/auto-stop), Kore Backend A (kore_backend.py + tests + skeleton), engine.py/hotkey.py, register_speed_key.ps1, and SPEC.md + FORWARD-TEST-CHECKLIST.md. Execution still inert pending firm-confirm of the Gr8Script/Kore calls.
backside_lifecycle.py as a setup/outcome-separated lifecycle, ran the AAOI single-name audit, pulled the full kti bar set 3/10–6/8, and ran two backtests (recent + 90-day) each with an HTML report + BACKSIDE-CLASSIFIER-AUDIT.md. The old gate tested entry depth, not the VWAP reclaim. Not promoted — awaiting James's reclaim-ceiling calibration.gen_scorecard_core.py + gen_scorecard_mt.py + MIGRATION-NOTES.md). Not yet wired into the live scorecards pipeline.pbs/ha/*, pvp_live_tick.pl, pvp-charts.js) + clean live/build runs.[WATCHDOG] RED: todos_snapshot fired again 06:31 ET; freshness.json generated_at still 2026-05-07 (33 days stale). The one signal designed to catch exactly the silent regressions we keep chasing.system/VWAP_PULL_IN_WALKFORWARD_OOS_VALIDATION.html + vwap_pull_in_walkforward_oos_summary.json — OOS validation, HOLD-promotion verdictsystem/VWAP_PULL_IN_GATE_VALIDATION_AUDIT.html + vwap_pull_in_gate_validation_summary.json — gate validation auditsystem/VWAP_PULL_IN_RVOL_INSTRUMENT_TYPE_CROSSTAB.html + JSON — RVOL × instrument-type crosstabsystem/VWAP_PULL_IN_FORWARD_TEST_TRACKER.html + vwap_pull_in_forward_test_schema.json — live forward-test rigsystem/VWAP_PULL_IN_ACTIONABLE_PLAYBOOK.html + vwap_pull_in_actionable_gate.json + vwap_pull_in_strategy_library_draft.json — actionable gate + candidate library entry_shared/chart_viewer.js, _shared/chart_viewer_v2.js, _shared/tooltip.js, setup_daily_reporting/reports/CHART_VIEWER_BRIEFING.md — scorecard chart viewertrading/dev/backside-classifier-audit/ — backside_lifecycle.py, backtest.py, backtest90.py, gen_report.py/gen_report90.py, two HTML reports, BACKSIDE-CLASSIFIER-AUDIT.md (read-only research, dev only)trading/dev/projected-5dma-environment/ — full pipeline (pull_daily_bars.py, build_features.py, analyze.py, archetype_interpreter.py), research report + strategy-aware addendum + implementation/forward-test plans + live forward-test rig + dashboard + index (dev only)trading/dev/hotkey-engine/ — gameplan_export.py, contract/setups.schema.json, target_engine.py, kore_backend.py (+ tests/skeleton), engine.py, hotkey.py, register_speed_key.ps1, SPEC.md, FORWARD-TEST-CHECKLIST.md (forward-test only)trading/dev/scorecards-multitrader/ — gen_scorecard_core.py, gen_scorecard_mt.py, MIGRATION-NOTES.md (in progress, dev only)trading/dev/pbs/ + trading/dev/pvp/ — HA script edits + clean live/build runsscorecards/trade_scorecard_2026-06-09.html + manifest + you-vs-you.html; full james-monthly-reports rebuild; mgp/2026-06-09{,-midday,-recap}.html