2026-05-11 (Mon) — Full pipeline clean, evening MGP code refresh

Monday · Generated by nightly-project-manager · ← All Todos · ← May 10
0
Shipped
0
Moved Forward
0
Blocked

Two writeups today. The morning version (08:13 ET, preserved above in version control if needed) covered the catch-up fire and heartbeat-infrastructure validation. This is the canonical end-of-day report from the 23:00 ET cron, capturing the full Monday picture.

What shipped

What moved forward

What's blocked

Tomorrow's priority

  1. Diff stocks_in_play.py + gen_mgp.py against last night's versions to characterize tonight's evening edits, so they get a real task entry instead of a vague file-touch line.
  2. Watch the 05:49 ET morning MGP fire as the live test of tonight's code edits. If the morning fire breaks, roll back via the git history on Z:\setup_daily_reporting\reports\.
  3. case-study-2026-05-12-AMZN is in-progress per todos.json; first fixture-driven case study fixture-set is the active foreground work.
  4. Decide on heartbeat parts (b)+(c). With 3 successful fires in a row the urgency is lower, but the next crash will be silent again without them.

Files touched